SERVICES EXPERTS

Technology Services

Data Center Relocation

"Data center move or relocation plan requires diligent and seamless integration between the data center facilities plan and the IS organization plan, and ensuring coordinated project management and execution."                                                                                                               - Gartner

Data center relocation demands strong technical and project management expertise. To be successful, it needs to be planned in detail, and implemented with utmost care to avoid any data losses and potential disruptions to critical business processes, which can impact an organization's overall business reputation.

Butler’s Data Center Relocation Services

Around the block or across the world, Butler's Data Center Relocation services provide customers with the expertise needed to mitigate business and network down-time. Each relocation is tailored to fit the client’s unique needs, scalable from basic box-and-ship to complete end-to-end turnkey solutions.

Butler's Data Center Relocation Advantages:

  • Certified and experienced Project managers and technicians with rich experience across all aspects of data center relocations over short and long distances
  • Site surveys to identify possible issues prior to the move, helping you avoid surprises along the way
  • Design documentation that includes connectivity matrix, and power requirements
  • Services customizable to suit any size data center from a partial rack to several hundred
  • Relocations available in the entire United States and across over one hundred countries globally

Features:

  • Project managers and certified technicians provide thousands of experience with all aspects of data center relocations over short and long distances
  • Site surveys identify possible issues prior to the move, helping you avoid surprises along the way
  • Design documentation provided that includes connectivity matrix, and power requirements
  • Services are customizable to suit any size data center from a partial rack to several hundred
  • Relocations are available in the entire United States and over one hundred countries globally

Pre-move Site Survey:

  • Document connectivity and label all equipment
  • Disconnect and de-install equipment
  • Prepare equipment for transportation
  • Load the equipment onto transportation vehicle
  • Transport equipment
  • Unload the equipment
  • Remount and connect equipment
  • Provide new equipment documentation (Visio)

Equipment Transport:

  • All air-ride units
  • Climate Controlled trailers
  • Lift Gates
  • Straight Trucks
  • Crane Vans
  • Special Handling
  • Inside Placement / Removal
  • Trained and Uniformed Employees
  • Insured for Replacement value
  • Charter Aircraft

On-Demand Services:

  • Onsite tier III Experts (CCIE, Nortel Experts, etc)
  • Cabling services (Inter-rack)
  • Project Management
  • As-Built drawings

Cabling Services:

  • Cabling design
  • Structured cabling
  • Phone System
  • Building raiser system
  • Campus Backbone
  • Computer rooms
  • Custom racking solutions
  • High bay installations
  • Outside plant conduit and cable
  • Data centers
  • Wireless telecommunication

Specialized Solutions:

  • Specialized crating
  • Logistic Bars
  • J-bolts and L- brackets reduce packing
  • Pad warp
  • Special placement
  • Cost effective solutions
  • As - Built Documentation:
    • Site surveys/inventories
    • Connectivity matrix
    • Visio drawings

What our customer say:

"Your assistance in transporting our data center from Tampa, FL to Charlotte, NC was like manna from heaven. Being a mid-size company we were having trouble finding an economical but yet highly professional and secure way to transport our equipment in a timely manner. We needed to perform tape backups on our databases, have (the equipment manufacturer) certify the equipment, shut down our servers, de-rack the computers, pack up our computers, load them in a vehicle, transport them across three state lines, unload the equipment, unpack the equipment, rack the servers in cabinets, have (the equipment manufacturer) certify the equipment, and be back online within a matters of 48 hours. Butler virtually did everything from the point of us shutting down the servers in Tampa to reconnect the equipment in Charlotte. We made our deadline with 12 hours to spare. None of the equipment even scratched in the moving process. Butler made our move virtually pain free"

- R. M. IT Director

Mr. Mike Duckworth
Tel: 919-645-3807
Email: mduckworth@butler.com

Mr. Matt Brooks
Tel: 954-761-2214
Email: mabrooks@butler.com

 

CASE STUDIES
BROCHURES